Hengshui Yitong Metal Products Co., Ltd
Products
Contact Us
  • Contact Person : Mr. Zhuang Kevin
  • Company Name : Hengshui Yitong Metal Products Co., Ltd
  • Tel : 86-318-7151015
  • Fax : 86-318-7151015
  • Address : Hebei,Hengshui,Jing County Guangchuan Industrial Zone
  • Country/Region : China
  • Zip : 053000

apply to bridges and bridge replacement structural plate culvert

apply to bridges and bridge replacement structural plate culvert
Product Detailed
Related Categories:Steel Pipes
plate material :SS400 or Q235 plate thickness:3.0-7.0mm advantage: corrosion-resistant easy to install

1.The  image of  company

2. workshop

3  stock

4.projects

5.  certification

6.Loading  to  Tianjin  Port

7.Global  cooperation 

8.   products  view

Product Description :

1. plate material :SS400  or  Q235

2.plate thickness:3.0-7.0mm

3.according to the form assembly is divided into  :Packaged  type ,assembly-type

4.divided by channel section shape :round ,oval ,arched ,horseshoe ,loop-shaped ,pear-shaped 

5.divided by the inmport and export forms;orthogonal ,oblique ;straight mouth ,angled

6. filling height:0.5-60m

7.diameter(span):2-12m

8.connected by pipe sections form is divided into :the flange,outer flange ,lap plates ,clamps connections.ect

9.corrugated  parameters:corrugated  from the (p)X corrugated depth(D)(mm)68x13  76x25  200x55  150x50  150x65  300x110  400x150

10. anti-corrosion  treatment :hot dip galvanized   ≥63 µm;second presevative (usually by coating asphalt).

11using  the  life : ≥ 75years

Main application of corrugated metal culvert pipes

1. For underdrains, tunnels, culverts and animal channels of highways (waterways)

2. For temporary bridges and the load bearing structures of bridges

3. For urban downcomers, storm sewers and waste water pipes

4. For pipe-laying in shared areas underground

Advantage

1.Our protucts has both rigid and flexible ;stucforce structure is reasonable force, load distribution ,has a certain resistance to deformation

2.The use of standardized designs,factory-scale production ;short production cycle.high efficiency.helps reduce costs and improve quslity .

3.on-site installation of speed ,short construction period ,social economic benifit.

4year-round construction.construction not subject to seasonal effects.not environmental impact.

 5.can effectively solve the freezing cold north area of concrete bridges and culverts due to repeated failure problems.

6.especially for loading soil ,expansive soil, loess and other special areas, to aviod distortion caused by uneven ground settlement of the culvert damage.

7.reduction of cement. sand,gravel and other conventional building materials used.environmentally significant 8.compared with concrete bridges and culverts,the same span of the corrugated steel bridge and lower total cost .

9.a small post maintenance work,maintenance and low cost.

apply to bridges and bridge replacement structural plate culvert



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.